>   THE HERITAGE GRAND TEA ROOM

THE HERITAGE GRAND TEA ROOM

Heritage project in Auckland with industrial style steel spiral staircase designed and built by Stai
Historic grand tea room heritage apartment with art deco ceiling in Auckland
Stairworks utilised a crane to bring all structural steel through penthouse window in Auckland
U shaped steel stairs and balustrade designed and built by Stairworks in Auckland
Timber treads and steel balustrade and handrail for u shaped architectural stairs by Stairworks
Industrial style metal railing and balustrade designed and built by Stairworks in Auckland
Metal balustrade design by Stairworks in Auckland
Spiral stairs designed and built by Stairworks in historic heritage home in Auckland
Steel and glass balustrades designed and built by steel manufactorer Stairworks
Industrial style glass and steel balustrades designed and built by Stairworks in Auckland
Structural steel and glass and timber treads on mezzanine by Stairworks
Stair design by Stairworks for architectural spiral staircase with timber and glass treads
Bespoke steel spiral staircase by Stairworks for luxury apartment in Auckland

Most people who have lived in Auckland for a long time remember The Heritage Grand Tearoom, a beautiful large room with an incredible high-stud art-deco ceiling. So we were beyond honoured to be a part of this, as projects of these types don’t come around very often.

Because The Heritage Grand Tea Room is a Heritage site, nothing could be fixed into the existing structure. Therefore, everything had to be self-supporting, which is why everything was made out of steel. And that’s where the first challenge began. 

The first step was getting the steel into the space. And due to the lack of access through the hotel, it had to come up through a window that was 1500x1500 with a 200 tonne mobile crane.  We had to custom fabricate a 9m long cage to accommodate the steel with rollers on the bottom of it that was engineered and certified. Once it was time to start building, we had to lay out the footprints of the foundations to set out the base layer of the mezzanine. This was an important part of the process as every aspect of the build relies on this stage being perfect. Due to the restrictions of the Heritage building and load ratings on the floor, there was a lot of steel required. A large part of the challenge was to have the structural fabrication up to an architectural quality painted to a Matte Black finish.

The last big challenge was bringing both the main and spiral staircase into the space, as well as the stanchions, as they are very large structures. We brought individual pieces up in the elevator and welded on site in order to bring the design to life. 

Although this was a tricky project, it was an absolute pleasure working with the owners of this incredible Heritage site and we are very proud of the final product.

ADDRESS

EMAIL

PHONE

SOCIAL

© 2020 by